Ad:Business Contacts
Ads:Current issue FRUIT PROCESSINGWorld Of Fruits 2023Our technical book Apple Juice TechnologyFRUIT PROCESSING Online Special: Instability of fruit-based beveragesFRUIT PROCESSING Online Special: Don’t give clogs a chanceOrange Juice ChainOur German magazine FLÜSSIGES OBST
News 17.08.2015

DP World Begins Work On New $1.6 Billion Container Terminal At Jebel Ali Port

Phase 1 of the Container Terminal 4 (T4) project will deliver new capacity of…

DP World Chairman HE Sultan Ahmed Bin Sulayem, announced the start of construction work on a brand new container terminal at Jebel Ali Port, Dubai.

Phase 1 of the Container Terminal 4 (T4) project will deliver new capacity of 3.1 million TEU (twenty-foot equivalent units) by 2018, taking Jebel Ali Port’s total capacity to 22.1 million TEU. The port complex will be equipped with at least 110 cranes with a total quay length of around 11,000 metres by that time.

T4 will be located on a reclaimed island north of the existing Terminal 2 allowing DP World to further expand capacity to a total of 7.8 million TEU in line with market demand. As part of the project, a bridge is being built to provide access to the island from land near Terminal 2. Work is scheduled to get the 3,000 metre causeway and bridge partially open to traffic before the end of 2015.

<< Back to overview